Pre-application meeting with TDC

It’s usual to have a number of meetings with the TDC to review the content of the application before it’s submitted. The TDC gives suggestions...

Bridge Hydrology Completed

Richard has finished his hydrology assessment which allows NCE to complete their bridge concepts and also completes all of the required reports. This means that...

Dig Day Results

Last Monday the geologist Anthony Chaney was on site directing various investigations.   On the farm side of the river bank CW Drilling drilled a...

Bridge Hydrology

Russell has produced some interesting topography for the river bed. He has shown the river cross sections and shape of the river banks. The 3...

Waterways Planting Plan

Summary This small unnamed stream is a tributary to the Roding River. It has been observed that the stream maintained a steady flow during the...

Bridge Survey

You may have noticed 3 white pegs on the road side at the proposed bridge location. These are where the surveyor will by measuring cross-sections...