It’s usual to have a number of meetings with the TDC to review the content of the application before it’s submitted. The TDC gives suggestions...
It’s usual to have a number of meetings with the TDC to review the content of the application before it’s submitted. The TDC gives suggestions...
Richard has finished his hydrology assessment which allows NCE to complete their bridge concepts and also completes all of the required reports. This means that...
Last Monday the geologist Anthony Chaney was on site directing various investigations. On the farm side of the river bank CW Drilling drilled a...
Russell has produced some interesting topography for the river bed. He has shown the river cross sections and shape of the river banks. The 3...
Summary This small unnamed stream is a tributary to the Roding River. It has been observed that the stream maintained a steady flow during the...
CW Drilling will be on site this coming Monday. They will be at the proposed bridge location to drill two geotech cores, one on the...
Lachie Grant surveyed the property in late March and has now finished his report. The part of the report relating to the proposal is copied...
In about 2 weeks the Engineer will be drilling 5m deep holes on each side of the river to see what the ground is like...
You may have noticed 3 white pegs on the road side at the proposed bridge location. These are where the surveyor will by measuring cross-sections...